

Commercial Hybrid
CompletedA 150 kW hybrid solar system with 290 kWh battery storage installed at a commercial property in Cape Town. The system was designed specifically to maintain critical operations during load-shedding events while optimising energy cost through daytime solar self-consumption. Battery storage covers essential loads for up to eight hours without grid support.
Scope of Work
- — Hybrid PV system
- — Battery energy storage
- — Load-shedding resilience
- — Grid tie with export
Delivered in partnership with our network.
Interested in a similar project?
Get in Touch